City hall Antwerp


status
1st prize Open Call

timeline
2014 - 2022

commissioner
Stad Antwerpen

location
Antwerp, B

program
city hall

site
1800m²

gfa
10.300m²

budget
€ 21.835.770,-

design team
HUB, Bureau Bouwtechniek, Origin, BAS, RCR, Daidalos, FPC, Germaine Kruip

photographer
Stijn Bollaert


 

The City Hall becomes a true ‘house of the city’. The ground floor and Noble floor will be (partially) opened up to the public while all councilors and
their staff will be brought back under one roof. In addition, the façades and interiors needed to be completely restored, while building also had to be
readied for future in terms of comfort and energy performance (BREEAM standard: ‘excellent’).

These aims mark the second major transition of the historic City Hall. One that can be compared to the very extensive transition of the 19th century in
which changes were made deep into the building’s spatial programme. It is therefore important to situate the current programme in the context of past changes to the building.

Despite the extent of the transition realised in the 19th century, it nevertheless succeeded in retaining
the City Hall’s historic “layered coherence”. There were certain revisions, newly made connections
and shifts in emphasis. And, building on the articulation and dimensions typical of the Floris style that defined the original City Hall, a more contemporary atmosphere was created that was evocative of the neo-Flemish renaissance.
Nevertheless, the original structure remained legible – it was literally “set forth” – and to the present day remains the canon of the building.
Preserving and reinforcing this layered coherence throughout the City Hall’s second historic transition calls for an approach that has respect for the
essence of the existing structure. An architecture founded on the conviction that the existing building must define what it needs itself, and that answers
to new questions are in fact already contained within the building’s historic structure or “code”.

The façades and interiors were restored with great attention and respect for the traces of time. The building did not undergo a ‘rejuvenation cure’ but a
dignified restoration.

We restored the spatial structure of the ground floor so that the space regains its brightness. All the gates can be opened again and the main entrance is located on the Grote Markt.

The second or ‘Illuminated Floor’, currently unknown to many people, will be made equally important as the ‘Noble Floor’, because it is here that the majority of councilors and their staff will be housed. We designed two centrally located, doubleheight spaces – the vestibules - who will let in more daylight and open up the view towards the skies
and historic bell tower. The vestibules extend the spatial articulation of the underlying floors to the level of the new ‘Illuminated Floor’.